Introduction to Fec101 Sep 28 2013

Exploring Fec101 Sep 28 2013 reveals several interesting facts. Gave him a light and Ray with a wave back. Paired again 100 and 140 with IM. Long train, had both crossings blocked waiting for ...

Fec101 Sep 28 2013 Comprehensive Overview

ECH and Jim with waves and smiles from 102 and 142, 709 and racks ahead of the IM. EoT past MP216 at 6:06PM. Mark with a wave on 102 and 709. Rock job on the head end, no IM, plenty of freight cars and a few racks on the bottom block. Meet was above us at Pineda, now Wally and Tony are through the junction on 103 and 140, 717LHF with all IM. Long train ...

Plenty of chatter as they roll the trains by at Micco. Tony with a wave from104 and 719, 713 leading all IM with a flag and a box ...

Summary & Highlights for Fec101 Sep 28 2013

  • ECH with a wave and a grin from the tread of 103 and 105, 708LHF racks on the head-end and then IM. Running the limit of ...
  • Tony heading home on 104 and 719, 716LHF with all IM. EoT past MP216 at 5:47PM.
  • ECH and Jim on a holiday schedule with 105 and 140, 413 leading two miles of IM. EoT past MP216 at 5:28PM.
  • 101 by mp236 at 6:24 with 814 & 819. Billy M and ECH glad to see us and ECH came out on the tread quickly to wave and throw ...
  • PHI AT ATL -

Stay tuned for more updates related to Fec101 Sep 28 2013.

Fec101 Sep 28 2013.pdf

Size: 15.87 MB · Format: PDF · Secure Download

Download PDF Read Online

Related Documents