Introduction to Fec920 Dec 14 2015

Exploring Fec920 Dec 14 2015 reveals several interesting facts. 920 by mp236 at 8:16 with 412 & 22 loaded hoppers zooming to mp188. Anita and Caboose.

Fec920 Dec 14 2015 Comprehensive Overview

412LHF with a dumper ahead of the loads. EoT past MP236 at 7:49am. 441 leads 2 dumpers and 421LHF with about three dozen loads heading for the siding at Bougard to meet FEC109. EoT past MP236 at 8:42am.

Pink Lady 425 with a lumber beam ahead of the rock going into Bougard for the meet with FEC109. EoT past MP236 at 7:45am.

Summary & Highlights for Fec920 Dec 14 2015

  • 920 by mp236 at 9:45 with 434 lhf. 2 covered hoppers in front of the loaded rock with one of the hoppers having the tagging of a ...
  • 412 with twenty-one local cars. EoT past MP236 at 8:04am.
  • 432LHF with 13 loads. EoT past MP236 at 7:53am.
  • 412 with one box ahead of the loads. Last one is Anita's tagged paint roller. EoT past MP236 at 7:54am.
  • 511LHF taking the loads into Bougard to meet the coal train.

Stay tuned for more updates related to Fec920 Dec 14 2015.

Fec920 Dec 14 2015.pdf

Size: 12.27 MB · Format: PDF · Secure Download

Download PDF Read Online

Related Documents