Exploring Fec920 Nov 6 2015

Exploring Fec920 Nov 6 2015 reveals several interesting facts.

  • 419LHF with 41 loads on the Pineda Turn. EoT past MP236 at 8:33am.
  • 433LHF with the loads for Winter Beach and MP188. EoT past MP236 at 8:18am.
  • 416 with couple of covered hoppers, 21 or so loads and a track switch in a gon. EoT past MP236 at 7:56am.
  • 807439 with the unit train. EoT past MP236 at
  • 920 by mp236 @ 11:45 with 433 lhf.Mark waving with a waffle box car and rock heading into Gifford. Anita and Caboose.

In-Depth Information on Fec920 Nov 6 2015

433LHF with about 21 loads. EoT past MP236 at 7:54am. 439LHF heading home from the Pineda Turn on Tues. EoT past MP236 at 1:31PM. 802810 with the morning train. EoT past MP236 at 7:10am. 109 by mp236 at 9:48 with 720 & 715. Racks up front, 3 sand cars, empty hoppers, tubs, a NS box car and IM on the bottom with ...

511LHF taking the loads into Bougard to meet the coal train.

Stay tuned for more updates related to Fec920 Nov 6 2015.

Fec920 Nov 6 2015.pdf

Size: 15.94 MB · Format: PDF · Secure Download

Download PDF Read Online

Related Documents